Providing world-class high-performance computing services to build a diverse AI ecosystem
KONST covers the full compute chain: AI data center build, GPU cluster delivery, compute rental, 24/7 operations, GPU cloud, and enterprise AI adoption, turning AI compute into business growth.
Three layers of capability,
supported as one
Physical compute, cloud platforms, and enterprise AI adoption come together as one integrated ecosystem.
Data center infrastructure and bare-metal compute delivery, spanning facility construction through 24/7 operations.
We provide GPU cloud compute, resource scheduling, and model deployment for the computing work that applications need.
We review requirements, develop AI applications, and integrate existing systems, using ATP to support model and usage management.
Five service categories covering the entire compute value chain
Compute investment, data center build, GPU cluster delivery, GPU bare-metal rental, colocation, 24/7 operations, and enterprise AI adoption: the five service categories connect into one complete delivery.
AI compute hardware infrastructureTurnkey delivery of data centers that can carry compute workloads right away, from site selection and civil works, mechanical and electrical planning, and environmental control to GPU clusters.
Data center operations24/7 on-site staff and remote monitoring, covering monitoring and alerts, troubleshooting, and UFM cluster network operations.
Compute rental and colocationGPU bare metal delivered on year-scale leases, or your own equipment hosted in colocation, with capacity and network environments already in place.
AI data center build
Building and power
Mechanical, electrical, and cooling
The data center can support high-density GPUs running at full load
Monitoring systems
Track data center faults
GPU cluster build
GPU clusters delivered
Compute Delivery
Bare metal, virtualization and containers, token metering
Digital Twin
Eliminate design errors
Data Center Operations
No in-house operations team needed, and compute runs 24/7 without interruption
Compute Rental
Rent dedicated compute at a lower cost than cloud services
GPU bare-metal rental
Whole batches of dedicated bare metal, full performance
GPU Colocation
Move your own GPUs
Enterprise AI adoptionFrom inventory of AI models and application workflows, benefit assessment, and pilots to system integration, ending in a controllable cost structure.
Enterprise AI Integration
Connect AI to
Horizon AI adoption service
Connect AI to daily workflows so it runs every day
ATP Token
One project key connects to more than 70 open-source models
Full-project delivery, or a single stage
Your existing resources set the scope of the engagement. Clients starting from scratch can commission the whole project, with go-live in as little as 4 months. Clients that already have some resources can start at a single stage: procurement, validation, or rental.
Full-project delivery
The hardware configuration is worked out from the investment size. Site selection, build, validation, and go-live operations are all delivered under one contract.
Single-stage engagement
If you already have some resources, you can enter at a specific stage, for example by commissioning only hardware procurement, cabling validation, or compute rental.
Linking the whole compute value chain
KONST's team takes on every stage, from site selection through build and validated delivery to go-live operations.
- 01Investment structureKonstra AI
- 02Site assessmentKonstra AI
- 03Data center buildKonstra AI
- 04Cabling validationKonstra AI
- 05Go-live operationsKonstra AI
- 06Compute RentalKonstra AI
- 07Glows.ai cloudGlows.ai
- 08Enterprise adoptionHorizon AI
One KONST delivers every stage of the compute chain
KONST was founded in 2024 and is headquartered in Nangang, Taipei. It operates its own high-power data centers and has delivered several sites in Taiwan and overseas. Its services cover the whole value chain: investment, build, operations, rental, and enterprise adoption.
FAQ
What services does KONST offer?
Where can I rent GB200/B300/H100 bare metal in Taiwan?
How long does it take to build an AI data center?
Who can help a company that wants to adopt AI but has no engineers?
Not sure which stage to start with?
Tell us your requirements and existing resources, and we will propose a suitable service mix and scope of engagement.