Malaysia CyberjayaLive in 2027 Q1
128 production nodes1,024 GPU
288GB per GPUabout 294.9TB total
800G InfiniBand
Direct-to-chip liquid cooling
Taiwan New TaipeiIn stock, immediate delivery7 to 14 days after the 3rd unit is signed
3 nodes24 GPU
80GB per GPU1.92TB total
Optional 400G
Air Cooling
Japan ChibaDelivery within 6 weeks of signing
4 nodes32 GPU
80GB per GPU640GB per node
400G Ethernet
Air Cooling
CzechiaLive March to June 2027
64 nodes512 GPU
288GB per GPUabout 147.5TB total
800Gbps
DLC liquid cooling
SwedenPOC at end of November 2026Go-live to be determined
37 nodes296 GPU
141GB per GPUabout 41.7TB total
3x ConnectX-7
Air Cooling
Australia SydneyLive in November 2026
64 nodes512 GPU
288GB per GPUabout 147.5TB total
CX8 ×8 embedded
To be confirmed
PolandPhased go-live from January 2027All units in place in February
128 nodes1,024 GPU
288GB per GPUabout 294.9TB total
800G InfiniBand
Air Cooling
Spain16 to 18 weeks after signing
128 nodes1,024 GPU
288GB per GPUabout 295TB total
800G InfiniBand
Air Cooling
United States HoustonDelivery in February 2027
64 nodes512 GPU
288GB per GPU147.5TB total
800G RoCE
Air Cooling
United States CaliforniaLive by mid-December 2026
32 nodes256 GPU
288GB per GPUabout 73.7TB total
800G RoCE
Air Cooling
United States CaliforniaLive by mid-December 2026
64 nodes512 GPU
288GB per GPUabout 147.5TB total
800G RoCE
Air Cooling
Canada TorontoDelivery 8 to 12 weeks after order
64 nodes512 GPU
288GB per GPUabout 147.5TB total
800G InfiniBand
Liquid cooling
Canada TorontoDelivery 8 to 12 weeks after order
140 nodes1,120 GPU
288GB per GPUabout 322.6TB total
800G InfiniBand
Liquid cooling
France Paris14 to 18 weeks after signing
50 nodes400 GPU
288GB per GPUabout 115TB total
800G InfiniBand
Air Cooling
Europe16 to 18 weeks after signing
144 nodes1,152 GPU
288GB per GPUabout 332TB total
800G InfiniBand
Air Cooling
Taiwan New TaipeiPre-saleSchedule to be determined
4 nodes32 GPU
288GB per GPUabout 9.2TB total
800G InfiniBand
Air Cooling