KONST
AI Training CalculatorContact us
EN
AIDC site | Asia · Japan

NVIDIA H100・Japan Chiba

JP-Chiba-H100Zero down payment planDelivery within 6 weeks of signing

Location
Japan Chiba
Availability
Delivery within 6 weeks of signing
Cooling
Air Cooling
Reference price
$3.80 USD / hr / GPU, starting price · Monthly
4Nodes
32GPU
80GB per GPUMemory per GPU640GB per node
400G EthernetGPU Fabric
Specifications

Full specifications

GPU, host, network, and site conditions in one place.

COMPUTECompute

GPU model
NVIDIA H100
GPU configuration
32 units8x H100 per node
Deployment scale
4 nodes32 GPU
Memory per GPU
80GB per GPU
Total cluster memory
640GB per node

HOSTHost

Processor
Dual AMD EPYC 4th Gen 96C or Dual Intel Xeon 4th Gen 24C (upgradable)
System memory
1,125GB DDR5 ECC DIMM per node
Storage
Up to 7.56TB enterprise-grade NVMe SSD

NETWORKNetwork

GPU interconnect
Ethernet 400GNVIDIA ConnectX-7
External network
10 GbE uplink per node

FACILITYSite and delivery

Location
Japan Chiba
Cooling
Air Cooling
Data center tier
Tier 3 equivalent
Availability
Delivery within 6 weeks of signing

WORKLOADSuitable workloads

Purpose
AI TrainingInferenceHPC

Remaining specifications are provided when you request a quote. Source: GPU cluster specification sheet · 2026-09-30

Delivery schedule

From signing to go-live

  1. 01Signing1/2/3 year term
  2. 02HandoverDelivery within 6 weeks of signing
  3. 03Go-liveConfirmed with quote

Prices, specifications, and availability are confirmed in the signed contract and do not reflect live inventory.

Location

Japan Chiba

Chiba
Region
Asia
Country / city
Japan Chiba
Site code
JP-Chiba-H100

Location is indicative, at country or city level.

Compare | Other sites

Sites with NVIDIA H100

Compare scale, network, cooling, and delivery time side by side.

SiteScaleGPU memoryGPU FabricCoolingAvailabilityStarting price, USD / hr / GPU
JP-Chiba-H100Japan ChibaThis page4 nodes
32 GPU
80GB per GPU
640GB per node
400G EthernetAir CoolingDelivery within 6 weeks of signing$3.80 from
TW-H100Taiwan New Taipei3 nodes
24 GPU
80GB per GPU
1.92TB total
Optional 400GAir CoolingIn stock, immediate delivery
7 to 14 days after the 3rd unit is signed
$3.80 from
FAQ | Common questions

Common questions

How are the price and delivery schedule confirmed?
Prices and delivery schedules are for evaluation reference. Actual specifications, availability, and commercial terms are set by the signed contract. Prices, specifications, and availability are confirmed in the signed contract and do not reflect live inventory.
How does bare metal differ from GPU cloud?
Bare metal is a physical machine with no virtualization layer, so all performance is available, but you manage the operating system and cluster yourself. GPU cloud comes with the environment prepared and activates quickly, but resources are shared with other tenants. Training at long-term full load usually goes to bare metal.
Besides overseas GPU clouds, what should be considered when renting locally?
Three things: data residency, network latency, and service hours. When data must not leave the country, equipment location is a hard requirement. Local latency is lower than transoceanic links. The local team keeps the same working hours as the lessee, so fault resolution does not wait on time zones.
Can the GPU count be increased or reduced mid-term?
Adding GPUs usually means adding nodes, with pricing folded into the original contract and subject to capacity at the time. Removing GPUs is restricted by take-or-pay terms, so in practice the scale is usually adjusted at renewal.
Who owns the equipment, and what does the rental fee cover?
KONST keeps ownership of the equipment. The renter pays for the right to use it, which covers data center space, power, network, and operations. KONST bears the risks tied to purchase funding, residual equipment value, and generation changes.
From installation to ready for use, where does KONST's delivery scope end?
From the initial operating system installation, KONST sets up the machines, drivers, and base environment, and configures a separate network segment and a dedicated VPN. After that, the renter manages frameworks, scheduling, and data storage on its own.

Want to get H100 compute quickly with a low down payment?