NVIDIA H100・Japan Chiba
JP-Chiba-H100Zero down payment planDelivery within 6 weeks of signing
- Location
- Japan Chiba
- Availability
- Delivery within 6 weeks of signing
- Cooling
- Air Cooling
- Reference price
- $3.80 USD / hr / GPU, starting price · Monthly
Full specifications
GPU, host, network, and site conditions in one place.
COMPUTECompute
- GPU model
- NVIDIA H100
- GPU configuration
- 32 units8x H100 per node
- Deployment scale
- 4 nodes32 GPU
- Memory per GPU
- 80GB per GPU
- Total cluster memory
- 640GB per node
HOSTHost
- Processor
- Dual AMD EPYC 4th Gen 96C or Dual Intel Xeon 4th Gen 24C (upgradable)
- System memory
- 1,125GB DDR5 ECC DIMM per node
- Storage
- Up to 7.56TB enterprise-grade NVMe SSD
NETWORKNetwork
- GPU interconnect
- Ethernet 400GNVIDIA ConnectX-7
- External network
- 10 GbE uplink per node
FACILITYSite and delivery
- Location
- Japan Chiba
- Cooling
- Air Cooling
- Data center tier
- Tier 3 equivalent
- Availability
- Delivery within 6 weeks of signing
WORKLOADSuitable workloads
- Purpose
Remaining specifications are provided when you request a quote. Source: GPU cluster specification sheet · 2026-09-30
From signing to go-live
- 01Signing1/2/3 year term
- 02HandoverDelivery within 6 weeks of signing
- 03Go-liveConfirmed with quote
Prices, specifications, and availability are confirmed in the signed contract and do not reflect live inventory.
Japan Chiba
- Region
- Asia
- Country / city
- Japan Chiba
- Site code
- JP-Chiba-H100
Location is indicative, at country or city level.
Sites with NVIDIA H100
Compare scale, network, cooling, and delivery time side by side.
| Site | Scale | GPU memory | GPU Fabric | Cooling | Availability | Starting price, USD / hr / GPU |
|---|---|---|---|---|---|---|
| JP-Chiba-H100Japan ChibaThis page | 4 nodes 32 GPU | 80GB per GPU 640GB per node | 400G Ethernet | Air Cooling | Delivery within 6 weeks of signing | $3.80 from |
| TW-H100Taiwan New Taipei | 3 nodes 24 GPU | 80GB per GPU 1.92TB total | Optional 400G | Air Cooling | In stock, immediate delivery 7 to 14 days after the 3rd unit is signed | $3.80 from |
Comparable alternatives
Sites in the same city or with the same GPU model come first, followed by sites in the same region and with similar delivery times.
Back to site searchNVIDIA H100・Taiwan New Taipei
3 nodes · 24 GPU
In stock, immediate delivery · 7 to 14 days after the 3rd unit is signed$3.80 USD / hr / GPU, starting price
NVIDIA B300・Malaysia Cyberjaya
128 production nodes · 1,024 GPU
Live in 2027 Q1$6.00 USD / hr / GPU, starting price
NVIDIA B300・Taiwan New Taipei
4 nodes · 32 GPU
Pre-sale · Schedule to be determined$6.00 USD / hr / GPU, starting price
Common questions
How are the price and delivery schedule confirmed?
How does bare metal differ from GPU cloud?
Besides overseas GPU clouds, what should be considered when renting locally?
Can the GPU count be increased or reduced mid-term?
Who owns the equipment, and what does the rental fee cover?
From installation to ready for use, where does KONST's delivery scope end?
Want to get H100 compute quickly with a low down payment?
Slots for the 0% down payment plan are limited. Tell us the lease term and how many GPUs you need, and we will reply with the delivery time.