NVIDIA B300・Taiwan New Taipei
TW-B300Pre-sale sitePre-sale
- Location
- Taiwan New Taipei
- Availability
- Pre-saleSchedule to be determined
- Cooling
- Air Cooling
- Reference price
- $6.00 USD / hr / GPU, starting price · Monthly
Full specifications
GPU, host, network, and site conditions in one place.
COMPUTECompute
- GPU model
- NVIDIA B300
- GPU configuration
- 32 units4 nodes × 8x B300 (baseline configuration, adjustable to your needs)
- Deployment scale
- 4 nodes32 GPU
- Memory per GPU
- 288GB HBM3e per GPU
- Memory per node
- 2,304GB per node
- Total cluster memory
- about 9.2TB total
HOSTHost
- Processor
- 2x Intel Xeon 6776P
- System memory
- 3TB per node
NETWORKNetwork
- GPU interconnect
- InfiniBand800Gb/s per GPU8 ports per node
FACILITYSite and delivery
- Location
- Taiwan New Taipei
- Cooling
- Air Cooling
- Availability
- Pre-saleSchedule to be determined
WORKLOADSuitable workloads
- Purpose
Remaining specifications are provided when you request a quote. Source: GPU cluster specification sheet · 2026-09-30
From signing to go-live
- 01SigningPre-sale
- 02HandoverConfirmed with quote
- 03Go-liveSchedule to be determined
Prices, specifications, and availability are confirmed in the signed contract and do not reflect live inventory.
Taiwan New Taipei
- Region
- Asia
- Country / city
- Taiwan New Taipei
- Site code
- TW-B300
- Sites in the same location
- TW-H100
Location is indicative, at country or city level.
Sites with NVIDIA B300
Compare scale, network, cooling, and delivery time side by side.
| Site | Scale | GPU memory | GPU Fabric | Cooling | Availability | Starting price, USD / hr / GPU |
|---|---|---|---|---|---|---|
| TW-B300Taiwan New TaipeiThis page | 4 nodes 32 GPU | 288GB per GPU about 9.2TB total | 800G InfiniBand | Air Cooling | Pre-sale Schedule to be determined | $6.00 from |
| AU-Sydney-B300Australia Sydney | 64 nodes 512 GPU | 288GB per GPU about 147.5TB total | CX8 ×8 embedded | To be confirmed | Live in November 2026 | $6.80 from |
| US-California-B300United States California | 64 nodes 512 GPU | 288GB per GPU about 147.5TB total | 800G RoCE | Air Cooling | Live by mid-December 2026 | $6.10 from |
| US-California-B300-32United States California | 32 nodes 256 GPU | 288GB per GPU about 73.7TB total | 800G RoCE | Air Cooling | Live by mid-December 2026 | $6.10 from |
| CA-Toronto-B300Canada Toronto | 64 nodes 512 GPU | 288GB per GPU about 147.5TB total | 800G InfiniBand | Liquid cooling | Delivery 8 to 12 weeks after order | $6.20 from |
| CA-Toronto-B300-XLCanada Toronto | 140 nodes 1,120 GPU | 288GB per GPU about 322.6TB total | 800G InfiniBand | Liquid cooling | Delivery 8 to 12 weeks after order | $6.20 from |
| PL-B300Poland | 128 nodes 1,024 GPU | 288GB per GPU about 294.9TB total | 800G InfiniBand | Air Cooling | Phased go-live from January 2027 All units in place in February | $6.00 from |
| MY-Cyberjaya-B300Malaysia Cyberjaya | 128 production nodes 1,024 GPU | 288GB per GPU about 294.9TB total | 800G InfiniBand | Direct-to-chip liquid cooling | Live in 2027 Q1 | $6.00 from |
| ES-B300Spain | 128 nodes 1,024 GPU | 288GB per GPU about 295TB total | 800G InfiniBand | Air Cooling | 16 to 18 weeks after signing | $6.10 from |
| EU-B300Europe | 144 nodes 1,152 GPU | 288GB per GPU about 332TB total | 800G InfiniBand | Air Cooling | 16 to 18 weeks after signing | $6.10 from |
| FR-Paris-B300France Paris | 50 nodes 400 GPU | 288GB per GPU about 115TB total | 800G InfiniBand | Air Cooling | 14 to 18 weeks after signing | $6.30 from |
| US-Houston-B300United States Houston | 64 nodes 512 GPU | 288GB per GPU 147.5TB total | 800G RoCE | Air Cooling | Delivery in February 2027 | $6.30 from |
| CZ-B300Czechia | 64 nodes 512 GPU | 288GB per GPU about 147.5TB total | 800Gbps | DLC liquid cooling | Live March to June 2027 | $6.50 from |
Comparable alternatives
Sites in the same city or with the same GPU model come first, followed by sites in the same region and with similar delivery times.
Back to site searchNVIDIA H100・Taiwan New Taipei
3 nodes · 24 GPU
In stock, immediate delivery · 7 to 14 days after the 3rd unit is signed$3.80 USD / hr / GPU, starting price
NVIDIA B300・Malaysia Cyberjaya
128 production nodes · 1,024 GPU
Live in 2027 Q1$6.00 USD / hr / GPU, starting price
NVIDIA B300・Czechia
64 nodes · 512 GPU
Live March to June 2027$6.50 USD / hr / GPU, starting price
Common questions
How are the price and delivery schedule confirmed?
How does bare metal differ from GPU cloud?
Besides overseas GPU clouds, what should be considered when renting locally?
Can the GPU count be increased or reduced mid-term?
Who owns the equipment, and what does the rental fee cover?
From installation to ready for use, where does KONST's delivery scope end?
Want to reserve B300 compute in Taiwan?
Tell us how many GPUs you need and the lease term, and we will reply with the delivery time and a quote.