NVIDIA H100・Taiwan New Taipei
TW-H100In-stock siteIn stock, immediate delivery
- Location
- Taiwan New Taipei
- Availability
- In stock, immediate delivery7 to 14 days after the 3rd unit is signed
- Cooling
- Air Cooling
- Reference price
- $3.80 USD / hr / GPU, starting price · Monthly
Full specifications
GPU, host, network, and site conditions in one place.
COMPUTECompute
- GPU model
- NVIDIA H100
- GPU configuration
- 24 units8x H100 80G per node
- Deployment scale
- 3 nodes24 GPU
- Memory per GPU
- 80GB per GPU
- Total cluster memory
- 1.92TB total
HOSTHost
- Processor
- 2x AMD EPYC 9654
- System memory
- 1,024GB DDR5 ECC RDIMM per node
- Storage
- Data: 10TB NVMe SSD (RAID 5+) + 10TB HDD (RAID 6+)OS disk installed by the customer through IPMI
NETWORKNetwork
- GPU interconnect
- None as standardAdd-on available: BF3 400G NIC (CX7)
- External network
- 100Mb/s standard bandwidth (can boost to 1Gb/s, billed at 95th percentile)
FACILITYSite and delivery
- Location
- Taiwan New Taipei
- Cooling
- Air Cooling
- Data center tier
- Tier III
- Availability
- In stock, immediate delivery7 to 14 days after the 3rd unit is signed
WORKLOADSuitable workloads
- Purpose
Remaining specifications are provided when you request a quote. Source: GPU cluster specification sheet · 2026-09-30
From signing to go-live
- 01Signing1/3 year term
- 02HandoverIn stock, immediate delivery7 to 14 days after the 3rd unit is signed
- 03Go-liveConfirmed with quote
Prices, specifications, and availability are confirmed in the signed contract and do not reflect live inventory.
Taiwan New Taipei
- Region
- Asia
- Country / city
- Taiwan New Taipei
- Site code
- TW-H100
- Sites in the same location
- TW-B300
Location is indicative, at country or city level.
Sites with NVIDIA H100
Compare scale, network, cooling, and delivery time side by side.
| Site | Scale | GPU memory | GPU Fabric | Cooling | Availability | Starting price, USD / hr / GPU |
|---|---|---|---|---|---|---|
| TW-H100Taiwan New TaipeiThis page | 3 nodes 24 GPU | 80GB per GPU 1.92TB total | Optional 400G | Air Cooling | In stock, immediate delivery 7 to 14 days after the 3rd unit is signed | $3.80 from |
| JP-Chiba-H100Japan Chiba | 4 nodes 32 GPU | 80GB per GPU 640GB per node | 400G Ethernet | Air Cooling | Delivery within 6 weeks of signing | $3.80 from |
Comparable alternatives
Sites in the same city or with the same GPU model come first, followed by sites in the same region and with similar delivery times.
Back to site searchNVIDIA B300・Taiwan New Taipei
4 nodes · 32 GPU
Pre-sale · Schedule to be determined$6.00 USD / hr / GPU, starting price
NVIDIA H100・Japan Chiba
4 nodes · 32 GPU
Delivery within 6 weeks of signing$3.80 USD / hr / GPU, starting price
NVIDIA B300・Malaysia Cyberjaya
128 production nodes · 1,024 GPU
Live in 2027 Q1$6.00 USD / hr / GPU, starting price
Common questions
How are the price and delivery schedule confirmed?
How does bare metal differ from GPU cloud?
Besides overseas GPU clouds, what should be considered when renting locally?
Can the GPU count be increased or reduced mid-term?
Who owns the equipment, and what does the rental fee cover?
From installation to ready for use, where does KONST's delivery scope end?
Want to get H100 online quickly in Taiwan?
In-stock machines are limited. Tell us how many GPUs you need and the lease term, and we will reply with the delivery time and a quote.