KONST
AI Training CalculatorContact us
EN
AIDC site | Asia · Taiwan

NVIDIA H100・Taiwan New Taipei

TW-H100In-stock siteIn stock, immediate delivery

Location
Taiwan New Taipei
Availability
In stock, immediate delivery7 to 14 days after the 3rd unit is signed
Cooling
Air Cooling
Reference price
$3.80 USD / hr / GPU, starting price · Monthly
3Nodes
24GPU
80GB per GPUMemory per GPU1.92TB total
Optional 400GGPU Fabric
Specifications

Full specifications

GPU, host, network, and site conditions in one place.

COMPUTECompute

GPU model
NVIDIA H100
GPU configuration
24 units8x H100 80G per node
Deployment scale
3 nodes24 GPU
Memory per GPU
80GB per GPU
Total cluster memory
1.92TB total

HOSTHost

Processor
2x AMD EPYC 9654
System memory
1,024GB DDR5 ECC RDIMM per node
Storage
Data: 10TB NVMe SSD (RAID 5+) + 10TB HDD (RAID 6+)OS disk installed by the customer through IPMI

NETWORKNetwork

GPU interconnect
None as standardAdd-on available: BF3 400G NIC (CX7)
External network
100Mb/s standard bandwidth (can boost to 1Gb/s, billed at 95th percentile)

FACILITYSite and delivery

Location
Taiwan New Taipei
Cooling
Air Cooling
Data center tier
Tier III
Availability
In stock, immediate delivery7 to 14 days after the 3rd unit is signed

WORKLOADSuitable workloads

Purpose
AI TrainingInferenceLLM

Remaining specifications are provided when you request a quote. Source: GPU cluster specification sheet · 2026-09-30

Delivery schedule

From signing to go-live

  1. 01Signing1/3 year term
  2. 02HandoverIn stock, immediate delivery7 to 14 days after the 3rd unit is signed
  3. 03Go-liveConfirmed with quote

Prices, specifications, and availability are confirmed in the signed contract and do not reflect live inventory.

Location

Taiwan New Taipei

New Taipei
Region
Asia
Country / city
Taiwan New Taipei
Site code
TW-H100
Sites in the same location
TW-B300

Location is indicative, at country or city level.

Compare | Other sites

Sites with NVIDIA H100

Compare scale, network, cooling, and delivery time side by side.

SiteScaleGPU memoryGPU FabricCoolingAvailabilityStarting price, USD / hr / GPU
TW-H100Taiwan New TaipeiThis page3 nodes
24 GPU
80GB per GPU
1.92TB total
Optional 400GAir CoolingIn stock, immediate delivery
7 to 14 days after the 3rd unit is signed
$3.80 from
JP-Chiba-H100Japan Chiba4 nodes
32 GPU
80GB per GPU
640GB per node
400G EthernetAir CoolingDelivery within 6 weeks of signing$3.80 from
FAQ | Common questions

Common questions

How are the price and delivery schedule confirmed?
Prices and delivery schedules are for evaluation reference. Actual specifications, availability, and commercial terms are set by the signed contract. Prices, specifications, and availability are confirmed in the signed contract and do not reflect live inventory.
How does bare metal differ from GPU cloud?
Bare metal is a physical machine with no virtualization layer, so all performance is available, but you manage the operating system and cluster yourself. GPU cloud comes with the environment prepared and activates quickly, but resources are shared with other tenants. Training at long-term full load usually goes to bare metal.
Besides overseas GPU clouds, what should be considered when renting locally?
Three things: data residency, network latency, and service hours. When data must not leave the country, equipment location is a hard requirement. Local latency is lower than transoceanic links. The local team keeps the same working hours as the lessee, so fault resolution does not wait on time zones.
Can the GPU count be increased or reduced mid-term?
Adding GPUs usually means adding nodes, with pricing folded into the original contract and subject to capacity at the time. Removing GPUs is restricted by take-or-pay terms, so in practice the scale is usually adjusted at renewal.
Who owns the equipment, and what does the rental fee cover?
KONST keeps ownership of the equipment. The renter pays for the right to use it, which covers data center space, power, network, and operations. KONST bears the risks tied to purchase funding, residual equipment value, and generation changes.
From installation to ready for use, where does KONST's delivery scope end?
From the initial operating system installation, KONST sets up the machines, drivers, and base environment, and configures a separate network segment and a dedicated VPN. After that, the renter manages frameworks, scheduling, and data storage on its own.

Want to get H100 online quickly in Taiwan?

In-stock machines are limited. Tell us how many GPUs you need and the lease term, and we will reply with the delivery time and a quote.