KONST
AI Training CalculatorContact us
EN
AIDC site | Europe · Poland

NVIDIA B300・Poland

PL-B300Thousand-GPU clusterPhased go-live from January 2027

Location
Poland
Availability
Phased go-live from January 2027All units in place in February
Cooling
Air Cooling
Reference price
$6.00 USD / hr / GPU, starting price · Monthly
128Nodes
1,024GPU
288GB HBM3e per GPUMemory per GPUabout 294.9TB total
800G InfiniBandGPU Fabric
Specifications

Full specifications

GPU, host, network, and site conditions in one place.

COMPUTECompute

GPU model
NVIDIA B300
GPU configuration
1,024 units128 nodes × 8x B300
Deployment scale
128 nodes1,024 GPU
Memory per GPU
288GB HBM3e per GPU
Memory per node
2.3TB per node
Total cluster memory
about 294.9TB total

HOSTHost

Processor
2x Intel Xeon Platinum 6776P
System memory
2TB or 4TB per node (depending on quote tier)
Storage
OS: 2x 1.92TB M.2 NVMeData: 8x 3.84TB E1.S NVMeShared storage: optional

NETWORKNetwork

GPU interconnect
InfiniBand 800GbpsNVIDIA ConnectX-88 ports per node
External network
2x BlueField-3 DPU 400G Ethernet (storage / management)

FACILITYSite and delivery

Location
Poland
Cooling
Air Cooling
Availability
Phased go-live from January 2027All units in place in February

WORKLOADSuitable workloads

Purpose
AI TrainingInferenceHPC

Remaining specifications are provided when you request a quote. Source: GPU cluster specification sheet · 2026-09-30

Delivery schedule

From signing to go-live

  1. 01Signing3/5 year term
  2. 02HandoverConfirmed with quote
  3. 03Go-livePhased go-live from January 2027All units in place in February

Prices, specifications, and availability are confirmed in the signed contract and do not reflect live inventory.

Location

Poland

Poland
Region
Europe
Country / city
Poland
Site code
PL-B300

Location is indicative, at country or city level.

Compare | Other sites

Sites with NVIDIA B300

Compare scale, network, cooling, and delivery time side by side.

SiteScaleGPU memoryGPU FabricCoolingAvailabilityStarting price, USD / hr / GPU
PL-B300PolandThis page128 nodes
1,024 GPU
288GB per GPU
about 294.9TB total
800G InfiniBandAir CoolingPhased go-live from January 2027
All units in place in February
$6.00 from
AU-Sydney-B300Australia Sydney64 nodes
512 GPU
288GB per GPU
about 147.5TB total
CX8 ×8 embeddedTo be confirmedLive in November 2026$6.80 from
US-California-B300United States California64 nodes
512 GPU
288GB per GPU
about 147.5TB total
800G RoCEAir CoolingLive by mid-December 2026$6.10 from
US-California-B300-32United States California32 nodes
256 GPU
288GB per GPU
about 73.7TB total
800G RoCEAir CoolingLive by mid-December 2026$6.10 from
CA-Toronto-B300Canada Toronto64 nodes
512 GPU
288GB per GPU
about 147.5TB total
800G InfiniBandLiquid coolingDelivery 8 to 12 weeks after order$6.20 from
CA-Toronto-B300-XLCanada Toronto140 nodes
1,120 GPU
288GB per GPU
about 322.6TB total
800G InfiniBandLiquid coolingDelivery 8 to 12 weeks after order$6.20 from
MY-Cyberjaya-B300Malaysia Cyberjaya128 production nodes
1,024 GPU
288GB per GPU
about 294.9TB total
800G InfiniBandDirect-to-chip liquid coolingLive in 2027 Q1$6.00 from
ES-B300Spain128 nodes
1,024 GPU
288GB per GPU
about 295TB total
800G InfiniBandAir Cooling16 to 18 weeks after signing$6.10 from
EU-B300Europe144 nodes
1,152 GPU
288GB per GPU
about 332TB total
800G InfiniBandAir Cooling16 to 18 weeks after signing$6.10 from
FR-Paris-B300France Paris50 nodes
400 GPU
288GB per GPU
about 115TB total
800G InfiniBandAir Cooling14 to 18 weeks after signing$6.30 from
US-Houston-B300United States Houston64 nodes
512 GPU
288GB per GPU
147.5TB total
800G RoCEAir CoolingDelivery in February 2027$6.30 from
CZ-B300Czechia64 nodes
512 GPU
288GB per GPU
about 147.5TB total
800GbpsDLC liquid coolingLive March to June 2027$6.50 from
TW-B300Taiwan New Taipei4 nodes
32 GPU
288GB per GPU
about 9.2TB total
800G InfiniBandAir CoolingPre-sale
Schedule to be determined
$6.00 from
FAQ | Common questions

Common questions

How are the price and delivery schedule confirmed?
Prices and delivery schedules are for evaluation reference. Actual specifications, availability, and commercial terms are set by the signed contract. Prices, specifications, and availability are confirmed in the signed contract and do not reflect live inventory.
How does bare metal differ from GPU cloud?
Bare metal is a physical machine with no virtualization layer, so all performance is available, but you manage the operating system and cluster yourself. GPU cloud comes with the environment prepared and activates quickly, but resources are shared with other tenants. Training at long-term full load usually goes to bare metal.
Besides overseas GPU clouds, what should be considered when renting locally?
Three things: data residency, network latency, and service hours. When data must not leave the country, equipment location is a hard requirement. Local latency is lower than transoceanic links. The local team keeps the same working hours as the lessee, so fault resolution does not wait on time zones.
Can the GPU count be increased or reduced mid-term?
Adding GPUs usually means adding nodes, with pricing folded into the original contract and subject to capacity at the time. Removing GPUs is restricted by take-or-pay terms, so in practice the scale is usually adjusted at renewal.
Who owns the equipment, and what does the rental fee cover?
KONST keeps ownership of the equipment. The renter pays for the right to use it, which covers data center space, power, network, and operations. KONST bears the risks tied to purchase funding, residual equipment value, and generation changes.
From installation to ready for use, where does KONST's delivery scope end?
From the initial operating system installation, KONST sets up the machines, drivers, and base environment, and configures a separate network segment and a dedicated VPN. After that, the renter manages frameworks, scheduling, and data storage on its own.

Want to deploy B300 at thousand-GPU scale in Europe?

Tell us how many GPUs you need and the lease term, and we will reply with the delivery time and a quote.