NVIDIA B300・United States California
US-California-B300-32Cluster (32 nodes)Live by mid-December 2026
- Location
- United States California
- Availability
- Live by mid-December 2026
- Cooling
- Air Cooling
- Reference price
- $6.10 USD / hr / GPU, starting price · Monthly
Full specifications
GPU, host, network, and site conditions in one place.
COMPUTECompute
- GPU model
- NVIDIA B300
- GPU configuration
- 256 units32 nodes × 8x B300
- Deployment scale
- 32 nodes256 GPU
- Memory per GPU
- 288GB HBM3e per GPU
- Total cluster memory
- about 73.7TB total
HOSTHost
- Processor
- 2x Intel Xeon 6776P
- System memory
- 2,048GB DDR5-6400 per node
- Storage
- OS: 2x 1.92TB NVMeData: 4x 7.68TB NVMe (30.72TB per node)
NETWORKNetwork
- GPU interconnect
- RoCE6,400Gbps per node (8x 800Gbps)NVIDIA ConnectX-8 SuperNIC
FACILITYSite and delivery
- Location
- United States California
- Cooling
- Air Cooling
- Availability
- Live by mid-December 2026
WORKLOADSuitable workloads
- Purpose
Remaining specifications are provided when you request a quote. Source: GPU cluster specification sheet · 2026-09-30
From signing to go-live
- 01Signing3 year term
- 02HandoverConfirmed with quote
- 03Go-liveLive by mid-December 2026
Prices, specifications, and availability are confirmed in the signed contract and do not reflect live inventory.
United States California
- Region
- North America
- Country / city
- United States California
- Site code
- US-California-B300-32
- Sites in the same location
- US-California-B300
Location is indicative, at country or city level.
Sites with NVIDIA B300
Compare scale, network, cooling, and delivery time side by side.
| Site | Scale | GPU memory | GPU Fabric | Cooling | Availability | Starting price, USD / hr / GPU |
|---|---|---|---|---|---|---|
| US-California-B300-32United States CaliforniaThis page | 32 nodes 256 GPU | 288GB per GPU about 73.7TB total | 800G RoCE | Air Cooling | Live by mid-December 2026 | $6.10 from |
| AU-Sydney-B300Australia Sydney | 64 nodes 512 GPU | 288GB per GPU about 147.5TB total | CX8 ×8 embedded | To be confirmed | Live in November 2026 | $6.80 from |
| US-California-B300United States California | 64 nodes 512 GPU | 288GB per GPU about 147.5TB total | 800G RoCE | Air Cooling | Live by mid-December 2026 | $6.10 from |
| CA-Toronto-B300Canada Toronto | 64 nodes 512 GPU | 288GB per GPU about 147.5TB total | 800G InfiniBand | Liquid cooling | Delivery 8 to 12 weeks after order | $6.20 from |
| CA-Toronto-B300-XLCanada Toronto | 140 nodes 1,120 GPU | 288GB per GPU about 322.6TB total | 800G InfiniBand | Liquid cooling | Delivery 8 to 12 weeks after order | $6.20 from |
| PL-B300Poland | 128 nodes 1,024 GPU | 288GB per GPU about 294.9TB total | 800G InfiniBand | Air Cooling | Phased go-live from January 2027 All units in place in February | $6.00 from |
| MY-Cyberjaya-B300Malaysia Cyberjaya | 128 production nodes 1,024 GPU | 288GB per GPU about 294.9TB total | 800G InfiniBand | Direct-to-chip liquid cooling | Live in 2027 Q1 | $6.00 from |
| ES-B300Spain | 128 nodes 1,024 GPU | 288GB per GPU about 295TB total | 800G InfiniBand | Air Cooling | 16 to 18 weeks after signing | $6.10 from |
| EU-B300Europe | 144 nodes 1,152 GPU | 288GB per GPU about 332TB total | 800G InfiniBand | Air Cooling | 16 to 18 weeks after signing | $6.10 from |
| FR-Paris-B300France Paris | 50 nodes 400 GPU | 288GB per GPU about 115TB total | 800G InfiniBand | Air Cooling | 14 to 18 weeks after signing | $6.30 from |
| US-Houston-B300United States Houston | 64 nodes 512 GPU | 288GB per GPU 147.5TB total | 800G RoCE | Air Cooling | Delivery in February 2027 | $6.30 from |
| CZ-B300Czechia | 64 nodes 512 GPU | 288GB per GPU about 147.5TB total | 800Gbps | DLC liquid cooling | Live March to June 2027 | $6.50 from |
| TW-B300Taiwan New Taipei | 4 nodes 32 GPU | 288GB per GPU about 9.2TB total | 800G InfiniBand | Air Cooling | Pre-sale Schedule to be determined | $6.00 from |
Comparable alternatives
Sites in the same city or with the same GPU model come first, followed by sites in the same region and with similar delivery times.
Back to site searchNVIDIA B300・United States California
64 nodes · 512 GPU
Live by mid-December 2026$6.10 USD / hr / GPU, starting price
NVIDIA B300・Canada Toronto
64 nodes · 512 GPU
Delivery 8 to 12 weeks after order$6.20 USD / hr / GPU, starting price
NVIDIA B300・Canada Toronto
140 nodes · 1,120 GPU
Delivery 8 to 12 weeks after order$6.20 USD / hr / GPU, starting price
Common questions
How are the price and delivery schedule confirmed?
How does bare metal differ from GPU cloud?
Besides overseas GPU clouds, what should be considered when renting locally?
Can the GPU count be increased or reduced mid-term?
Who owns the equipment, and what does the rental fee cover?
From installation to ready for use, where does KONST's delivery scope end?
Want to get B300 compute quickly on the US West Coast?
Tell us how many GPUs you need and the lease term, and we will reply with the delivery time and a quote.