KONST
AI Training CalculatorContact us
EN
AIDC site | Oceania · Australia

NVIDIA B300・Australia Sydney

AU-Sydney-B300Data centerLive in November 2026

Location
Australia Sydney
Availability
Live in November 2026
Cooling
To be confirmed
Reference price
$6.80 USD / hr / GPU, starting price · Monthly
64Nodes
512GPU
288GB per GPUMemory per GPUabout 147.5TB total
CX8 ×8 embeddedGPU Fabric
Specifications

Full specifications

GPU, host, network, and site conditions in one place.

COMPUTECompute

GPU model
NVIDIA B300
GPU configuration
512 unitsNVIDIA HGX B300 8-GPU per node (embedded)
Deployment scale
64 nodes512 GPU
Memory per GPU
288GB per GPU
Total cluster memory
about 147.5TB total (Estimated from standard B300 specifications)

HOSTHost

Processor
2x Intel Xeon 6767P per node
System memory
3TB DDR5 6400 per node (32x 96GB RDIMM)
Storage
OS: 2x 960GB PCIe Gen4 SSDData: 8x 3.84TB NVMe (30.72TB per node)

NETWORKNetwork

GPU interconnect
8x CX8 (embedded)
External network
1x BF3240

FACILITYSite and delivery

Location
Australia Sydney
Availability
Live in November 2026

WORKLOADSuitable workloads

Purpose
AI TrainingHPC

Remaining specifications are provided when you request a quote. Source: GPU cluster specification sheet · 2026-09-30

Delivery schedule

From signing to go-live

  1. 01Signing5 year term
  2. 02HandoverConfirmed with quote
  3. 03Go-liveLive in November 2026

Prices, specifications, and availability are confirmed in the signed contract and do not reflect live inventory.

Location

Australia Sydney

Sydney
Region
Oceania
Country / city
Australia Sydney
Site code
AU-Sydney-B300

Location is indicative, at country or city level.

Compare | Other sites

Sites with NVIDIA B300

Compare scale, network, cooling, and delivery time side by side.

SiteScaleGPU memoryGPU FabricCoolingAvailabilityStarting price, USD / hr / GPU
AU-Sydney-B300Australia SydneyThis page64 nodes
512 GPU
288GB per GPU
about 147.5TB total
CX8 ×8 embeddedTo be confirmedLive in November 2026$6.80 from
US-California-B300United States California64 nodes
512 GPU
288GB per GPU
about 147.5TB total
800G RoCEAir CoolingLive by mid-December 2026$6.10 from
US-California-B300-32United States California32 nodes
256 GPU
288GB per GPU
about 73.7TB total
800G RoCEAir CoolingLive by mid-December 2026$6.10 from
CA-Toronto-B300Canada Toronto64 nodes
512 GPU
288GB per GPU
about 147.5TB total
800G InfiniBandLiquid coolingDelivery 8 to 12 weeks after order$6.20 from
CA-Toronto-B300-XLCanada Toronto140 nodes
1,120 GPU
288GB per GPU
about 322.6TB total
800G InfiniBandLiquid coolingDelivery 8 to 12 weeks after order$6.20 from
PL-B300Poland128 nodes
1,024 GPU
288GB per GPU
about 294.9TB total
800G InfiniBandAir CoolingPhased go-live from January 2027
All units in place in February
$6.00 from
MY-Cyberjaya-B300Malaysia Cyberjaya128 production nodes
1,024 GPU
288GB per GPU
about 294.9TB total
800G InfiniBandDirect-to-chip liquid coolingLive in 2027 Q1$6.00 from
ES-B300Spain128 nodes
1,024 GPU
288GB per GPU
about 295TB total
800G InfiniBandAir Cooling16 to 18 weeks after signing$6.10 from
EU-B300Europe144 nodes
1,152 GPU
288GB per GPU
about 332TB total
800G InfiniBandAir Cooling16 to 18 weeks after signing$6.10 from
FR-Paris-B300France Paris50 nodes
400 GPU
288GB per GPU
about 115TB total
800G InfiniBandAir Cooling14 to 18 weeks after signing$6.30 from
US-Houston-B300United States Houston64 nodes
512 GPU
288GB per GPU
147.5TB total
800G RoCEAir CoolingDelivery in February 2027$6.30 from
CZ-B300Czechia64 nodes
512 GPU
288GB per GPU
about 147.5TB total
800GbpsDLC liquid coolingLive March to June 2027$6.50 from
TW-B300Taiwan New Taipei4 nodes
32 GPU
288GB per GPU
about 9.2TB total
800G InfiniBandAir CoolingPre-sale
Schedule to be determined
$6.00 from
FAQ | Common questions

Common questions

How are the price and delivery schedule confirmed?
Prices and delivery schedules are for evaluation reference. Actual specifications, availability, and commercial terms are set by the signed contract. Prices, specifications, and availability are confirmed in the signed contract and do not reflect live inventory.
How does bare metal differ from GPU cloud?
Bare metal is a physical machine with no virtualization layer, so all performance is available, but you manage the operating system and cluster yourself. GPU cloud comes with the environment prepared and activates quickly, but resources are shared with other tenants. Training at long-term full load usually goes to bare metal.
Besides overseas GPU clouds, what should be considered when renting locally?
Three things: data residency, network latency, and service hours. When data must not leave the country, equipment location is a hard requirement. Local latency is lower than transoceanic links. The local team keeps the same working hours as the lessee, so fault resolution does not wait on time zones.
Can the GPU count be increased or reduced mid-term?
Adding GPUs usually means adding nodes, with pricing folded into the original contract and subject to capacity at the time. Removing GPUs is restricted by take-or-pay terms, so in practice the scale is usually adjusted at renewal.
Who owns the equipment, and what does the rental fee cover?
KONST keeps ownership of the equipment. The renter pays for the right to use it, which covers data center space, power, network, and operations. KONST bears the risks tied to purchase funding, residual equipment value, and generation changes.
From installation to ready for use, where does KONST's delivery scope end?
From the initial operating system installation, KONST sets up the machines, drivers, and base environment, and configures a separate network segment and a dedicated VPN. After that, the renter manages frameworks, scheduling, and data storage on its own.

Need a site that can scale all the way to a thousand GPUs?

The Sydney site can expand from 512 to 1,024 GPUs. Tell us your growth curve and we will reply with an expansion plan.