KONST
AI Training CalculatorContact us
EN
AIDC site | Europe · Sweden

NVIDIA H200・Sweden

SE-H200Flexible-use sitePOC at end of November 2026

Location
Sweden
Availability
POC at end of November 2026Go-live to be determined
Cooling
Air Cooling
Reference price
$4.20 USD / hr / GPU, starting price · Monthly
37Nodes
296GPU
141GB HBM3e per GPUMemory per GPUabout 41.7TB total
3x ConnectX-7GPU Fabric
Specifications

Full specifications

GPU, host, network, and site conditions in one place.

COMPUTECompute

GPU model
NVIDIA H200
GPU configuration
296 units8x H200 per node
Deployment scale
37 nodes296 GPU
Memory per GPU
141GB HBM3e per GPU
Total cluster memory
about 41.7TB total

HOSTHost

Processor
2x AMD EPYC 9374F per node
System memory
1.5TiB per node
Storage
OS: 2x 2TiB NVMeData: 2x 3TiB NVMe (10TiB raw per node)

NETWORKNetwork

GPU interconnect
10 Gbit/sec Ethernet + 3x ConnectX-7 per node
External network
Same as GPU fabric

FACILITYSite and delivery

Location
Sweden
Cooling
Air Cooling
Data center tier
Tier 3
Availability
POC at end of November 2026Go-live to be determined

WORKLOADSuitable workloads

Purpose
TrainingInferenceRenderingCAD

Remaining specifications are provided when you request a quote. Source: GPU cluster specification sheet · 2026-09-30

Delivery schedule

From signing to go-live

  1. 01Signing1/2/3 year term
  2. 02POCPOC at end of November 2026
  3. 03HandoverConfirmed with quote
  4. 04Go-liveGo-live to be determined

Prices, specifications, and availability are confirmed in the signed contract and do not reflect live inventory.

Location

Sweden

Sweden
Region
Europe
Country / city
Sweden
Site code
SE-H200

Location is indicative, at country or city level.

Compare | Other sites

Sites with NVIDIA H200

Compare scale, network, cooling, and delivery time side by side.

This is currently the only site with NVIDIA H200. Other GPU models are listed below for comparison.

SiteScaleGPU memoryGPU FabricCoolingAvailabilityStarting price, USD / hr / GPU
SE-H200SwedenThis page37 nodes
296 GPU
141GB per GPU
about 41.7TB total
3x ConnectX-7Air CoolingPOC at end of November 2026
Go-live to be determined
$4.20 from
TW-H100Taiwan New Taipei · NVIDIA H1003 nodes
24 GPU
80GB per GPU
1.92TB total
Optional 400GAir CoolingIn stock, immediate delivery
7 to 14 days after the 3rd unit is signed
$3.80 from
JP-Chiba-H100Japan Chiba · NVIDIA H1004 nodes
32 GPU
80GB per GPU
640GB per node
400G EthernetAir CoolingDelivery within 6 weeks of signing$3.80 from
AU-Sydney-B300Australia Sydney · NVIDIA B30064 nodes
512 GPU
288GB per GPU
about 147.5TB total
CX8 ×8 embeddedTo be confirmedLive in November 2026$6.80 from
US-California-B300United States California · NVIDIA B30064 nodes
512 GPU
288GB per GPU
about 147.5TB total
800G RoCEAir CoolingLive by mid-December 2026$6.10 from
US-California-B300-32United States California · NVIDIA B30032 nodes
256 GPU
288GB per GPU
about 73.7TB total
800G RoCEAir CoolingLive by mid-December 2026$6.10 from
CA-Toronto-B300Canada Toronto · NVIDIA B30064 nodes
512 GPU
288GB per GPU
about 147.5TB total
800G InfiniBandLiquid coolingDelivery 8 to 12 weeks after order$6.20 from
CA-Toronto-B300-XLCanada Toronto · NVIDIA B300140 nodes
1,120 GPU
288GB per GPU
about 322.6TB total
800G InfiniBandLiquid coolingDelivery 8 to 12 weeks after order$6.20 from
PL-B300Poland · NVIDIA B300128 nodes
1,024 GPU
288GB per GPU
about 294.9TB total
800G InfiniBandAir CoolingPhased go-live from January 2027
All units in place in February
$6.00 from
MY-Cyberjaya-B300Malaysia Cyberjaya · NVIDIA B300128 production nodes
1,024 GPU
288GB per GPU
about 294.9TB total
800G InfiniBandDirect-to-chip liquid coolingLive in 2027 Q1$6.00 from
ES-B300Spain · NVIDIA B300128 nodes
1,024 GPU
288GB per GPU
about 295TB total
800G InfiniBandAir Cooling16 to 18 weeks after signing$6.10 from
EU-B300Europe · NVIDIA B300144 nodes
1,152 GPU
288GB per GPU
about 332TB total
800G InfiniBandAir Cooling16 to 18 weeks after signing$6.10 from
FR-Paris-B300France Paris · NVIDIA B30050 nodes
400 GPU
288GB per GPU
about 115TB total
800G InfiniBandAir Cooling14 to 18 weeks after signing$6.30 from
US-Houston-B300United States Houston · NVIDIA B30064 nodes
512 GPU
288GB per GPU
147.5TB total
800G RoCEAir CoolingDelivery in February 2027$6.30 from
CZ-B300Czechia · NVIDIA B30064 nodes
512 GPU
288GB per GPU
about 147.5TB total
800GbpsDLC liquid coolingLive March to June 2027$6.50 from
TW-B300Taiwan New Taipei · NVIDIA B3004 nodes
32 GPU
288GB per GPU
about 9.2TB total
800G InfiniBandAir CoolingPre-sale
Schedule to be determined
$6.00 from
FAQ | Common questions

Common questions

How are the price and delivery schedule confirmed?
Prices and delivery schedules are for evaluation reference. Actual specifications, availability, and commercial terms are set by the signed contract. Prices, specifications, and availability are confirmed in the signed contract and do not reflect live inventory.
How does bare metal differ from GPU cloud?
Bare metal is a physical machine with no virtualization layer, so all performance is available, but you manage the operating system and cluster yourself. GPU cloud comes with the environment prepared and activates quickly, but resources are shared with other tenants. Training at long-term full load usually goes to bare metal.
Besides overseas GPU clouds, what should be considered when renting locally?
Three things: data residency, network latency, and service hours. When data must not leave the country, equipment location is a hard requirement. Local latency is lower than transoceanic links. The local team keeps the same working hours as the lessee, so fault resolution does not wait on time zones.
Can the GPU count be increased or reduced mid-term?
Adding GPUs usually means adding nodes, with pricing folded into the original contract and subject to capacity at the time. Removing GPUs is restricted by take-or-pay terms, so in practice the scale is usually adjusted at renewal.
Who owns the equipment, and what does the rental fee cover?
KONST keeps ownership of the equipment. The renter pays for the right to use it, which covers data center space, power, network, and operations. KONST bears the risks tied to purchase funding, residual equipment value, and generation changes.
From installation to ready for use, where does KONST's delivery scope end?
From the initial operating system installation, KONST sets up the machines, drivers, and base environment, and configures a separate network segment and a dedicated VPN. After that, the renter manages frameworks, scheduling, and data storage on its own.

One site that runs training and graphics workloads at the same time

Tell us your workload mix and preferred lease term, and we will reply with a node configuration and a tiered quote.